Applying standardized work to enhance the manufacturing process at Pipe line 5: a case study of Bosch Ho Chi Minh City Plant in Dong Nai

Applying standardized work to enhance the manufacturing process at Pipe line 5: a case study of Bosch Ho Chi Minh City Plant in Dong Nai: Graduation's thesis of the Industrial Management/ Pham Thi Thuy Nguyen; Truong Van Nam (Supervisor)--Ho Chi Minh city: Ho Chi Minh city University of technology and education, 2024
Call no.: QCN-24 658.5 P534-N573

Từ khóa: Manufacturing process

1 p thehoangthk 25/09/2024 51 4

Bạn đang xem trang mẫu tài liệu này.